Sanmenxia Swan Lake Tourism Resort Part of the road traffic signs layout update production installation project self-procurement announcement
Date:2019-10-09Click:1719
Press photo Sanmenxia municipal government to deploy arrangements for the creation of provincial Sanmenxia Swan Lake Resort, and are now on the Sanmenxia Swan Lake Resort is part of a road traffic sign layout update fabrication and installation works project their own procurement . According to relevant regulations, the project meets the conditions for self-purchasing projects, and suppliers who meet the relevant conditions are welcome to participate in the bidding. The announcement of the self-purchase documents is as follows:
1. Brief description of the bidding items
1. Project Name: Sanmenxia Swan Lake Tourism Resort Part of the Road Traffic Signage Layout Update Production Installation Project
2, Project Content: Sanmenxia Swan Lake Resort is part of a road traffic sign layout update involved and national and provincial highways and city roads , the specific location to owners of views prevail.
3. Tender No: smxdjq2019- 008
4. Installation location: Roads around Sanmenxia Swan Lake Tourism Resort
5. Source of funds: own funds
6. Budget price : 47160.7 yuan
7. Duration : 7 calendar days
8. Production specifications :
① gauge lattice: the layout update making 9 Panel: 5000mm * 3000mm, 4000mm * 3000mm , 3000mm * 2000mm;
②Technology : The bottom plate adopts American 3M high-strength brown reflective film, and the text pattern is white;
2. Supplier qualification requirements:
1. Conform to the provisions of Article 22 of the "People's Republic of China Government Procurement Law"
2. The bidder must be an independent legal person registered in the People's Republic of China and hold a valid business license.
3 , has a wealth of Sanmenxia tourism road sign making experience ( based on contract ) .
Three, bid registration
1. Those who wish to applicants, please 2019 Nian 10 Yue 12 Ri 1 1 : 3 0 before the Sanmenxia City, China Unicom Building, 12th floor Resort Zone comprehensive set of registration. Registration contact number 0398-2825077.
2. The materials to be submitted when registering are as follows:
2.1 The ID card of the bidder’s legal representative or the power of attorney of the legal person and the ID card of the authorized person;
2.2 Copy of business license , relevant contract, no bad integrity record ;
2.3 The originals of the above documents shall be brought for inspection, and one set of copies shall be kept (the copies shall be bound into a book in order and stamped with the corporate seal on a page-by-page basis, and the power of attorney shall be retained for legal persons)
2. 4 prepaid bid bond 6000, after winning into a performance bond.
Fourth, the medium of announcement
The tender announcement was published on the websites of Sanmenxia Cultural Tourism Group and Sanmenxia Swan Lake Tourism Resort .
5. Submission of bid documents
1. For the deadline and place for submitting bid documents, please refer to the bid documents;
2. Tenderee will not accept bidding documents that are overdue or not delivered to the designated place.
6. Contact Information
Tenderee: Comprehensive Group of Management Committee of Sanmenxia Swan Lake Resort
Contact: Zhao Dan Telephone: 0398-2825077
7. Instructions for bidders
7 .1 | Signing or stamping requirements | The cover letter of the bid document , the appendix of the bid letter, and the itemized quotation form shall all be stamped with the official seal of the bidder and stamped or signed by the legal representative (agent). |
7 .2 | Number of bid documents | Original One part, a copy of the II part; |
7 .3 | Binding requirements | The bidding documents must be firmly bound in sequence . The originals and copies of the bid documents shall be bound into separate volumes, and the cover shall indicate the originals or copies. Bidding documents should be compiled into a catalog. |
7 .4 | Sealing requirements | The original and copy of the bidding documents should be sealed in a package with a seal, and the seal of the bidder's unit should be affixed to the seal of the envelope |
7 .5 | On the envelope | Project Name: Sanmenxia Swan Lake Tourism Resort Part of the Road Traffic Signs Production and Installation Project Tender number: smxdjq2019-00 8 Bidder's name: 2019 10 Yue 12 Ri 15 Shi 00 minutes (opening time) can not be unsealed before. The openings of the bidders, legal representatives and the seal of the bidding documents are sealed with a sealing strip and sealed with the official seal of the bidding unit. |
7 .6 | Place to submit bid documents | Sanmenxia City Unicom Building 12-Floor Resort Management Committee Comprehensive Group |
7 .7 | Whether to return the bid documents | no |
7 .8 | Bid opening time and place | Opening time: 2019 Nian 10 Yue 12 Ri 15 : 00 minutes Bid Opening Location: Sanmenxia Unicom Building 17th Floor Conference Room |
7 .9 | Precautions for bid opening | At the time of opening the bid, the legal representative or authorized agent (authorization letter) of each bidder will participate in the bid opening meeting with the original identity certificate and the original ID card. Each bidder must submit a paper version of the bid document before the deadline for bidding and sign in successfully. Those who do not arrive at the above-mentioned requirements or do not arrive after the deadline will be deemed to have automatically abandoned the bid. |
7 .10 | Bid Opening Procedure | (1) Sealing inspection: Bidders and supervisors check the sealing of their bidding documents. Bidding documents that are not sealed according to the relevant national standards shall be returned to the bidder by the bid inviting party and will not be accepted. (2) Bid opening sequence: Bid opening is in reverse order of the order of bid documents. |
7 .11 | Bid evaluation method | The same condition, the low price won the bid; the non-equal condition, the reasonable low price won the bid. |
Formation of Bid Evaluation Committee | 1 person each from the City Cultural Tourism Group , the Cultural Tourism Bureau , and the Resort Comprehensive Group , | |
7 .12 | Whether to authorize the bid evaluation committee to determine the winning bidder | No, the recommended number of successful candidates: 2 Ming |
7 .13 | tender sum limit | The bidding control price for this project is: 44802.7 yuan ( including design fee and control price preparation fee ). Where the bid price of a bidder exceeds the "bidding control price" (excluding the "bidding control price"), the bidder's bid documents shall be treated as invalid bids. |
7 .14 | Tender quotation composition | Price summary table, price list, etc. |
7 .15 | Payment method | Payment after passing the construction and acceptance. |
7.16 | Engineering shelf life | 5 years |
8. Contract award
1. Calibration
The bid inviting party shall determine the winning bidder based on the winning bid candidates recommended by the bid evaluation team, and the number of candidates recommended by the bid evaluation committee shall be found in the notice of the bidder.
2. Notification of winning the bid
The bid inviting party will inform the winning bidder of the result of winning the bid.
3. Sign a contract
The bid inviting party and the winning bidder shall conclude a written contract based on the bidding documents and the bidding documents of the winning bidder within 5 days from the date of issuance of the bid winning notice . If the winning bidder refuses to sign the contract without justified reasons, the bid inviting party shall cancel the qualification for winning the bid.
9. Overall project requirements
After the contract is signed, the traffic sign that will set the resort at the designated location within 10 calendar days
The identity card is erected at the designated position according to the production process and requirements .
Sanmenxia Swan Lake Tourism Resort Management Committee Comprehensive Group
Sanmenxia Cultural Tourism Transportation Development Group Co., Ltd.
Nian 2019 10 Yue 9 Ri
Attachment: Bid document format
(project name)
Investment standard text pieces
Project Number: smxdjq2019- 008
Supplier: (with official seal)
Legal representative or his authorized agent: (signature or seal)
Year Month Date
Head record
1. Bidding letter , appendix of bidding letter , itemized quotation table
2. Identification of the legal representative
3. Power of Attorney
Four, technical solutions
5. Service Commitment
6. Qualification documents
7. Other materials that the supplier believes should be provided
1. Bidding letter , appendix of bidding letter , itemized quotation table
(1) Bidding letter
(Name of purchaser):
1. We have carefully studied the entire contents of the (project name) bidding documents, and are willing to use the bid quotation in RMB (upper case) and lower case ( ¥ ) to implement and complete the contracted project according to the contract and the quality is satisfactory.
2, our commitment in the bid validity ( 3 does not modify calendar days within day 0) to revoke the tender documents.
3. If we win the bid:
( 1) We promise to sign a contract with you within the time limit specified in the bid winning notice after receiving the bid winning notice.
( 2) The appendix of the bid letter submitted with this bid letter is an integral part of the contract document.
( 3) We are willing to pay the bidding agency service fee in accordance with the provisions of the bidding documents.
4. We hereby declare that the bid documents and relevant materials submitted are complete, true and accurate.
5. (Other supplementary notes).
Supply should quotient: (cover units chapter)
Legal representative or his authorized agent: (signature or seal)
address:
phone:
fax:
Postcode:
date
(2) Schedule of bid letter
project name | ||||
Tender number | ||||
Supplier name | ||||
Bid price (yuan) | capital: | Lowercase: ¥ yuan | ||
Bidding scope | ||||
Quality requirements | ||||
Preparation period | ||||
Bid validity | ||||
Project manager | profession | |||
Remarks |
Supply should quotient: (cover units chapter)
Legal representative or his authorized agent: (signature or seal)
Day period: _____ in _____ month _____ day
(B) sub- item Report monovalent table
Serial number | name | Specification requirements | Quantity (㎡) | Comprehensive unit price (yuan) | Amount (yuan) |
1 |
Reflective film material (9 pieces) | The bottom plate adopts American 3M high-strength brown reflective film, and the text pattern is white |
105 | ||
2 | Layout production fee | According to design drawings | 105 | ||
3 | Installation fee | 105 | |||
4 | Design fee and control price preparation fee | 1 | 5800 | 5800 | |
5 | total |
Full name of the bidding unit (seal): Plenipotentiary (signature):
2. Identification of the legal representative
Supplier Name: .
Ownership: .
Address: .
Time of establishment: Year Month Day
Operating period: .
Name: Gender: Age: Position:
The legal representative of the department ( supplier name).
Hereby prove.
Supplier : (Stamp of the unit)
date
3. Power of Attorney
I (name) is the legal representative of (bidder's name), and we now entrust (name) as our agent. According to the authorization, the agent signs, clarifies, explains, corrects, submits, withdraws, revises (project name) bid documents, signs contracts and handles related matters in our name. The legal consequences shall be borne by us.
deadline:.
The agent has no right to delegate.
Supplier : (Stamp of the unit)
Signature of Legal Representative)
ID number: .
Authorized agent: (signature)
ID number: .
date
Remarks:
1. A copy of the ID of the entrusted agent should be attached after the power of attorney.
2. If the supplier ’s legal representative signs the bid documents, there is no need to submit a power of attorney.
Four , technical solutions
The supplier shall prepare the implementation plan of the project in the form of text or charts according to the bidding documents and the situation of the project.
Supply should quotient: (cover units chapter)
Legal representative or his authorized agent: (signature or seal)
Day period : _____ in _____ month _____ day
Five , service commitment , and commitment to safety book
(Self-made format)
Supply should quotient: (cover units chapter)
Legal representative or his authorized agent: (signature or seal)
Day period: _____ month _____ day of _____
6. Qualification documents
Business license .
7. Other materials that the supplier believes should be provided
- Previous:Miaodigou Cultural Tourism Industrial Park Construction Project Feasibility Study Report Adjustment and Preparation of Supplementary Instructions for Project Self-Purchase
- Next:Miaodigou Cultural Tourism Industrial Park Construction Project Feasibility Study Report Adjustment and Preparation Project Self-Purchase Announcement